Jim is a Principal Engineering Geologist that has managed and provided engineering geologic services for complex geotechnical projects throughout California and in Oregon, Nevada, New Mexico, Oklahoma, and the former Soviet Union since 1983. He specializes in multifaceted, detailed geotechnical studies for difficult access sites and characterization of complex, geologically impacted sites.
Representative Experience
Oakland to San Francisco Bay Bridge Replacement
Jim managed the preliminary geotechnical studies for the onshore components at Yerba Buena Island for the replacement of the Bay Bridge. These services included extensive onshore coring and geophysical surveys, offshore coring and downhole in-situ testing, extensive laboratory testing and geotechnical modeling, and preparation of a preliminary geotechnical report for the project.
Coastal Aqueduct Extension (Phase II) of the California State Water Project.
Jim was the manager of geotechnical services and responsible engineering geologist for the design of the Central Coast Water Authority’s components of the Coastal Aqueduct Extension (Phase II) of the California State Water Project. This project included 73 miles of large-diameter flexible pipeline, three 2-million-gallon pre-stressed concrete tanks, a 40-million gallon-per-day water treatment plant, a pump station, a scour evaluation of the pipeline crossing of the Santa Maria River, and a microtunnel alignment beneath the Santa Ynez River.
Marathon Oil’s Sakhalin Island, Russia, Feasibility Study
Marathon Oil obtained the first offshore oil and gas lease within Russia following the breakup of the Soviet Union. To develop the offshore oil field extraction and onshore infrastructure to support the processing and shipping of petroleum in this remote eastern margin of Russia, Marathon performed the first Environmental Impact Statement prepared using western standards. Jim interacted with Russian representatives while on Sakhalin Island, managed the collection and dissemination of geologic and geotechnical data relative to the project, and managed a team of geologists and geotechnical engineers in preparing the Geologic Resources section for the environmental document.
Redwood Creek Levee Stability Evaluation, Humboldt County
Jim managed geotechnical services for the evaluation of the 3.4-mile-long levee system (twin levees – 6.8 miles total), which was constructed in 1968 and was in the process of being recertified. The studies included performing explorations at 92 locations using sonic cores, cone penetrometer soundings, and conventional hollow-stem auger drill holes. The project involved extensive laboratory testing and transient seepage, slope stability, liquefaction, and settlement analyses for 18 cross sections along the levee to evaluate potential deficiencies for the levee system.